Application:
Medical
Pump Guides
Material:
Polyeitherimide
(medical grade)
Tooling:
Four cavity,
Class 101 mold
Customer Requirements:
High production
tooling capable of over 1 million parts, guaranteed
Chemical resistance
to most reagents
Dimensional stability
at high temperatures
Our Approach:
C2 provided
a complete Class 101 mold in 8 weeks. Customer was able to utilize our
first article samples in their product introduction with no modifications.
Current mold has produced over 300,000 units with no signs of mold wear
or damage.
[ Back
to Applications Page ]
|