Application:
Medical Pump Guides


Material:

Polyeitherimide (medical grade)


Tooling:

Four cavity, Class 101 mold 


Customer Requirements:

High production tooling capable of over 1 million parts, guaranteed
Chemical resistance to most reagents
Dimensional stability at high temperatures


Our Approach:

C2 provided a complete Class 101 mold in 8 weeks. Customer was able to utilize our first article samples in their product introduction with no modifications. Current mold has produced over 300,000 units with no signs of mold wear or damage. 


[ Back to Applications Page ]